Atest
EN 13501-1 : 2010/MPA Dresden, 2010-B-2628/04
Coverage
20% more the typical render e.g. 2.3 kg/m2 for manual application, from 1.9 kg/m2 for mechanical application
Structure
Dotted 1.5mm
Relative air humidity during application and curing
< 80%
Density of the finished product
ca 1.9 g/cm3
Drying time
ca 2 hours
Outdoor use
Yes
Reaction to fire
B-s2, d0
Frost-resistant
Yes
Indoor use
Yes
Use at low temperatures (above 0°C) and high humidity (up to approx. 80%)
After adding the Eskimo additive
pH
8
Drying time
about 15 minutes - applies to t=20°C relative humidity 60%
The temperature of the mass preparation, the substrate and the environment before the commencement of works, during the works and during the binding period
5 to 30 °C